Was discussing in another group a while back, we figure 6-12 hours work/prep for every hour we demonstrate. The hobby is almost a second full time job. May get the wood cutting demo ready by spring, need someone to run it. Got the double bit now, needs handle. Got to get handle for maul, plus a folding/take apart sawbuck made. Got 3 more crosscuts, these one man, keeping the best 3 1/2 footer, other is trade for the ax. Got a 2 1/2 footer as well as the 4 1/2 two man and bucksaw. Got the wedges also and the single bit.